POST

The success/fail results of the diagnostic tests that run during POST can be monitored through LED activity, the error log, or a command line interface.

POST includes the following tasks:

  1. Conduct preliminary POST diagnostics
  2. Initialize the operating system
  3. Initialize hardware
  4. Run diagnostic tests on several functions, including circuitry, port functionality, memory, statistics counters, and serialization